Design the room based on operations, before defining the construction or technology.

BRCO defines the operational, ergonomic, visual, and technical foundation required to properly build, equip, and sustain a mission-critical room.

Design reduces uncertainty before purchasing, building, or committing CAPEX/OPEX.

01 / Design criteria

First understand the operation. Then design the environment.

Design must respond to decisions, users, visual sources, space, ergonomics and continuity. Without that foundation, the project becomes a set of isolated purchases.

Operation

Operation

What is decided, how it is coordinated, which events escalate and what cannot stop.

Users

Users

Operators, supervisors, support, maintenance and the roles involved in the room.

Visual sources

Visual sources

Which information must be seen at an individual position and which must be shared on the visual layer.

Space

Space

Usable area, access, circulation, physical constraints, growth and functional zones.

24/7 ergonomics

24/7 ergonomics

Posture, reach, lighting, visual fatigue, comfort and extended operation.

Continuity

Continuity

How the room is implemented, maintained and evolved without losing operation.

BRCO criterion: design must close technical, operational and economic uncertainty before committing CAPEX or OPEX.

03 / Design path

From situational diagnosis to preliminary design

The path converts initial information into an architectural concept, integration criteria and design package.

01

Diagnosis

Area, operation, users, photographs, physical and technological conditions.

02

Concept

Distribution, zones, visualization, ergonomics, integration and growth.

03

Validation

Review with operations, engineering, projects, maintenance and key users.

04

Preliminary design

Design package, phases, technical criteria and basis for decision.

04 / Deliverables

The outcome must support decision and execution

Control room design does not end with a conceptual image. It must leave criteria, scope, phases and an economic basis.

Operational survey

Operational survey

Room information, operator activities, users, requirements and constraints.

3D distribution

3D distribution

Concept for workspaces, positions, functional zones, circulation and growth.

Visual and ergonomic criteria

Visual and ergonomic criteria

Sightlines, operational ergonomics, comfort, posture, reach and visual fatigue.

Materials, lighting and acoustics

Materials, lighting and acoustics

Finishes, colors, lighting concept, luminaire alternatives and acoustic recommendations.

Schedule / Gantt chart

Schedule / Gantt chart

Intervention sequence, phases, dependencies, execution windows and responsibilities.

Scope and economic basis

Scope and economic basis

Specifications, solution criteria and reference economic estimate based on available information.

05 / Design, operation and sustainability references

Each reference is used according to project scope

BRCO does not apply a generic list of standards. It selects criteria for ergonomics, infrastructure, AV, service, sustainability and local regulations according to room criticality and contracted scope.

Ergonomics and room

ISO 11064

Ergonomics, arrangement, visualization and environmental conditions for control rooms.

ISO 9241-5

Ergonomic requirements for work with visual display screens.

EN 527

Dimensions, stability and mechanical safety of desks and work surfaces.

Infrastructure and security

TIA/EIA 942

Technical infrastructure or data center criteria when the scope requires it.

ISO/IEC 27001

Information security when the project involves access, data or critical infrastructure.

Local regulations

Construction, safety, permits, power, civil protection and site-specific conditions.

Service, AV and sustainability

ISO 20000 / ITIL

Support management, service levels, maintenance and post-deployment operation when the project includes lifecycle.

AVIXA

AV best practices for visual experience, audiovisual integration and technical documentation.

SAVe

Sustainability, lifecycle and responsible practices in the audiovisual industry.

BRCO criterion: the references guide the design; final application depends on detailed engineering, local regulatory validation and project responsibilities.

06 / Contact

Define the design foundation for your room

BRCO will review operation, space, users, visualization, ergonomics and constraints to propose a design path with clear deliverables.

  • Control room design and integration.
  • KVM and video wall solutions
  • Specialized support and maintenance