BRCO Global EN

BRCO / PLATFORM DECISION WORKBENCH

Define the route for your critical project

Control rooms, video walls, KVM, AV over IP, IoT connectivity, Private APN and RemoteCare: each need requires a different route.

BRCO organizes the need, ecosystem, methodology and next step

01 / STARTING POINT

Select the need closest to your project

Some projects start with a room, others with visualization, connectivity, support or scope uncertainty.

screen lines

“We need to implement a control room.”

New room, operators, supervision, ergonomics, layout and 24/7 operation.

Route: Control RoomsView route
reload

“We need to renew an existing room.”

Space, consoles, visualization or layout no longer match the operation.

Ruta: ModernizationView route
panel six

“We are not sure which space to use or where to start.”

Uncertainty about space, growth, criticality, phases, budget or dependencies.

Route: Operational AssessmentView route
panel four

“We need to install or modernize a video wall.”

Displays, sources, shared monitoring or visualization for a critical room.

Ruta: VisualizationView route
screen squares

“We need a more modern video controller.”

Sources, windows, layouts, profiles, applications and video wall control.

Route: Video ControllerView route
hierarchy

“We need KVM for the operators.”

Access to multiple systems from cleaner, more controlled operator positions.

Route: KVM / OperatorView route
cross circle

“We need a distributed AV over IP solution.”

Flexible distribution of signals and displays over the network.

Route: Distributed VisualizationView route
circle arrow top

“We need to connect remote equipment.”

Routers, cameras, GPS, sensors, meters, gateways or off-site assets.

Route: IoT/M2M ConnectivityView route
shield check

“We need Private APN or secure access.”

Private APN, addressing, secure remote access, traceability and control.

Route: Private APN / Secure AccessView route
signal

“We need backup where mobile coverage does not reach.”

Connectivity continuity in remote areas or isolated assets.

Route: Satellite IoTView route
shield check

“We need support after deployment.”

Monitoring, remote diagnostics, reports, extended warranty and backup.

Route: RemoteCareView route
question

“We need the best possible control room.”

Turn a broad ambition into scope, phases, architecture and roadmap.

Route: BRCO WorkbenchView route

02 / OPERATIONAL ECOSYSTEM

From the field to operations

BRCO integrates assets, connectivity, visualization and operations into a coherent architecture.

Field
01

Field

Assets, video, sensors and remote equipment.

Connectivity
02

Connectivity

SIM/eSIM, APN, VPN and secure access.

Visualization
03

Visualization

Video wall, KVM and signal processing.

Operations
04

Operations

Decision-making, coordination and 24/7 continuity.

Result: consistent, scalable situational awareness aligned with critical processes.

03 / IMPLEMENTATION METHODOLOGY

An ordered process to reduce risk

Each stage leaves clear deliverables to support technical and commercial decisions.

Diagnosis
01

Diagnosis

Operational needs, current environment and technical scope.

Design
02

Design

Architecture, layout, components and integration.

Manufacturing / configuration
03

Manufacturing / configuration

Consoles, controllers, connectivity and security.

Implementation
04

Implementation

Installation, testing, documentation and training.

Support
05

Support

Support, maintenance and platform evolution.

04 / CONTACT

Tell us your starting point

BRCO translates it into route, architecture, methodology and next step.

BRCO will review your case and recommend the right route.