BRCO / CONTROL ROOMS / ROOM DESIGN
Design the room based on operations, before defining the construction or technology.
BRCO defines the operational, ergonomic, visual, and technical foundation required to properly build, equip, and sustain a mission-critical room.
Design reduces uncertainty before purchasing, building, or committing CAPEX/OPEX.
01 / Design criteria
First understand the operation. Then design the environment.
Design must respond to decisions, users, visual sources, space, ergonomics and continuity. Without that foundation, the project becomes a set of isolated purchases.
Operation
What is decided, how it is coordinated, which events escalate and what cannot stop.
Users
Operators, supervisors, support, maintenance and the roles involved in the room.
Visual sources
Which information must be seen at an individual position and which must be shared on the visual layer.
Space
Usable area, access, circulation, physical constraints, growth and functional zones.
24/7 ergonomics
Posture, reach, lighting, visual fatigue, comfort and extended operation.
Continuity
How the room is implemented, maintained and evolved without losing operation.
BRCO criterion: design must close technical, operational and economic uncertainty before committing CAPEX or OPEX.
02 / Risks addressed
A room can fail even with good equipment
Design anticipates conditions that affect attention, comfort, coordination and operator performance.
Visual risk
Poorly located displays, uncomfortable monitors or glare from interior and exterior lighting.
Background noise
Acoustic stress in spaces where concentration must be sustained during long shifts.
Materials and colors
Finishes without visual coherence that affect perception, comfort and how the environment is read.
Operational misalignment
Furniture or visualization that does not respond to processes, users or business criticality.
03 / Design path
From situational diagnosis to preliminary design
The path converts initial information into an architectural concept, integration criteria and design package.
Diagnosis
Area, operation, users, photographs, physical and technological conditions.
Concept
Distribution, zones, visualization, ergonomics, integration and growth.
Validation
Review with operations, engineering, projects, maintenance and key users.
Preliminary design
Design package, phases, technical criteria and basis for decision.
04 / Deliverables
The outcome must support decision and execution
Control room design does not end with a conceptual image. It must leave criteria, scope, phases and an economic basis.
Operational survey
Room information, operator activities, users, requirements and constraints.
3D distribution
Concept for workspaces, positions, functional zones, circulation and growth.
Visual and ergonomic criteria
Sightlines, operational ergonomics, comfort, posture, reach and visual fatigue.
Materials, lighting and acoustics
Finishes, colors, lighting concept, luminaire alternatives and acoustic recommendations.
Schedule / Gantt chart
Intervention sequence, phases, dependencies, execution windows and responsibilities.
Scope and economic basis
Specifications, solution criteria and reference economic estimate based on available information.
05 / Design, operation and sustainability references
Each reference is used according to project scope
BRCO does not apply a generic list of standards. It selects criteria for ergonomics, infrastructure, AV, service, sustainability and local regulations according to room criticality and contracted scope.
Ergonomics and room
ISO 11064
Ergonomics, arrangement, visualization and environmental conditions for control rooms.
ISO 9241-5
Ergonomic requirements for work with visual display screens.
EN 527
Dimensions, stability and mechanical safety of desks and work surfaces.
Infrastructure and security
TIA/EIA 942
Technical infrastructure or data center criteria when the scope requires it.
ISO/IEC 27001
Information security when the project involves access, data or critical infrastructure.
Local regulations
Construction, safety, permits, power, civil protection and site-specific conditions.
Service, AV and sustainability
ISO 20000 / ITIL
Support management, service levels, maintenance and post-deployment operation when the project includes lifecycle.
AVIXA
AV best practices for visual experience, audiovisual integration and technical documentation.
SAVe
Sustainability, lifecycle and responsible practices in the audiovisual industry.
BRCO criterion: the references guide the design; final application depends on detailed engineering, local regulatory validation and project responsibilities.
Define the design foundation for your room
BRCO will review operation, space, users, visualization, ergonomics and constraints to propose a design path with clear deliverables.
- Control room design and integration.
- KVM and video wall solutions
- Specialized support and maintenance
